Prepare the GPS
You will need to do some preparation before starting the assembly.
Version v1.0.2 of the documentation is no longer actively maintained. The site that you are currently viewing is an archived snapshot. For up-to-date documentation, see the latest version.
Now that you have all the parts available, you will need to configure some of them, so that they will work together in the end.
You will need to do some preparation before starting the assembly.
In this step we will install the SD card and configure the basic settings for our mower.
Disassemble the robot, remove the existing mainboard and add optionally a USB connector.
If the mainboard does not have any firmware, you need to install it for the first use
Required ‘xESC’ motor controller
Optional sound